– 8/11/2016 UPDATE –
Summer Series 2016 cancelled for now (Bummerrrrr!!!)..
Just need to wait on adequate insurance options before I can reschedule for thefirst series of Events… Continue reading
– 8/11/2016 UPDATE –
Summer Series 2016 cancelled for now (Bummerrrrr!!!)..
Just need to wait on adequate insurance options before I can reschedule for thefirst series of Events… Continue reading
The 8″ 5′ x 10′ mats came in last week! Thanks Action Factory!
I finished building the Assembly/Disassembly Tower last week, yay! The AD Tower is what will help me errect and disassemble The Frame, solo, in a single day (in theory!) as opposed to what took me 3 weeks to do originally.
Currently I’m in progress of raising the main box (what holds all the hanging obstacles) on The Frame from its current 9.5 ft height to competition 13 ft height to accommodate the fall padding and slightly more swing for suspended obstacles. This requires the precision of leveling and stabelized support of the over 800lb Frame, whilst drilling, lifting and bolting sections at a time. Humpty Dumpty is not recommended to be any where near the set during this operation.